cropped-cropped-cropped-512x512-1.png

Access to Safe Drinking Water is a Fundamental Human Right.

Our Projects

State-of-the-Art Surface Water Treatment Technology

Our Projects

The JE Hydro and Bio-Energy Corporation’s proprietary water treatment process can produce fresh, drinking water that meets global and national standards. In its commitment to deliver safe and affordable drinking water, quality is made a top priority in every aspect in JE Hydro’s water treatment plant operations, from raw water abstraction to product delivery.

100 MLD Rio Verde WTP

In 2005, the pioneering team of JE Hydro started its Design & Build engagement with Rio Verde Water Consortium, Inc. The 100MLD WTP that our team had successfully designed, built and commissioned in Jan 2007 is currently supplying 80MLD bulk water to Cagayan de Oro City Water District.

30 MLD Pototan, Iloilo

In 2013, JE Hydro completed the Design & Build Contract with Flo Water Resources Inc. for the 30MLD WTP to cater to the growing requirements of the Iloilo Water District.

15 MLD Isabel, Leyte

In 2009, JE Hydro completed the Design & Build Contract for the 15MLD WTP of the Municipality of Isabel, Leyte. The LGU also awarded to JE Hydro a 10-year O&M contract for the operation & maintenance of the said 15MLD Water Treatment facility.

6 MLD Esperanza, Agusan del Sur

In August 2018, JE Hydro completed the Design & Build Contract for the 6MLD Water Treatment Plant of the Municipality of Esperanza in Agusan del Sur. The contract is inclusive of the installation of a 26-kilometer transmission and distribution pipe lines.

2 MLD Baungon, Bukidnon

In 2016, JE Hydro completed the Design & Build Contract for the 2MLD Water Treatment Plant of the Municipality of Baungon, Province of Bukidnon. This is the first Modular Water Treatment Plant constructed by JE Hydro.

10 MLD Richli Corp. - Bohol

In 2018, JE Hydro completed the Design & Build Contract with Richli Corp for its 10MLD WTP that will supply potable water to Dauis, Panglao and Tagbilaran City. Richli Corp. has also awarded to JE Hydro a 10-year O&M Contract for the operation and maintenance of the said 10MLD WTP.

1.5 MLD Inopacan, Leyte

In 2019, JE Hydro supplied and installed a 1.5MLD Modular Water Treatment Plant for the Municipality of Inopacan, Leyte. This is JE Hydro’s first compact, steel type modular WTP.

3 MLD Libagon, Leyte

In August 2020, JE Hydro completed the Design & Build Contract for the 3MLD Water Treatment Plant of the Municipality of Libagon, Province of Southern Leyte. The contract is inclusive of the installation of a main transmission pipe line.

10 MLD SBRI - Iponan, CDO

Completed in 2022, JE Hydro’s Design and Build contract for this 10 MLD WTP features our first installation of a flood-proof water treatment plant. This facility is owned by South Balibago Resources Inc. (”SBRI”).

2 MLD Ramon Magsaysay, Zamboanga del Sur

In 2020, JE Hydro completed the Design and Build of this 2 MLD Water Treatment Plant for the Municipality of Ramon Magsaysay, Zamboanga del Sur.

3 MLD Pualas Bukidnon

Completed in 2022, This facility is owned by JE Hydro and Bio-Energy Corporation located in Pualas, Baungon, Bukidnon. This facility is designed by World’s First Water Ventures Inc. and constructed by High Valley Multi-purpose Cooperative.

5 MLD Indahag, CDO

In 2022, JE Hydro completed its 5 MLD water treatment plant that supplies potable water to Brgy. Indahag, Cagayan de Oro City through its Level-III water distribution system.

2 MLD Macrohon, Southern Leyte

This newly inaugurated Water Treatment Plant is owned by the Local Government of the Municipality of Macrohon, Southern Leyte. This WTP is commissioned by JE Hydro & Bio-Energy Corporation with a design & build scheme within a 12-month contract.

1 MLD Tandag City, Surigao del Sur

This WTP, completed in 2022 is located in Tigao, Cortes, Surigao del Sur and a project of Tandag City as an improvement to its Level-III water distribution system.

30 MLD Lusaran, Cebu City

In 2021, we completed the 30 MLD JE Hydro Lusaran Water Treatment Plant that will supply potable bulk water to Metropolitan Cebu Water District (MCWD). This engineering marvel features a 30-km pipeline to Busay & Pit-os, Cebu City along with a massive 3-hectare lagoon and undergoing additional 3-hectare lagoon that will ensure the continuous supply of potable water even during El Niño events.

10 MLD San Pablo, Laguna

Completed recently, this WTP has a small footprint considering its 10 million liters per day capacity. Also, this WTP sits atop the 1,000-m3 reservoir.

On-going Projects

2 MLD Dagohoy, Bohol

Contract: Upgrading/ Improvement of Waterworks System

3 MLD San Miguel, Surigao del Sur

Contract: Design and Build Project for the improvement of San Miguel Water System Phase 1

30 MLD Desalination Project

Unsolicited Proposal to Metropolitan Cebu Water District (“MCWD”)

We Successfully Completed 16 Projects across the Philippines

We have installations in Luzon, Visayas & Mindanao.

0 +
Years of Experience
0 +
Projects Completed
0 +
On-going Projects
0 +
Expert Engineers

News & Articles

Access to Safe Drinking Water is a Fundamental Water Right

cropped-cropped-cropped-512x512-1.png

Access to Safe Drinking Water is a Fundamental Human Right.